Scheduled
Sunday, April 12
9:30 AM · ~120 min
Check in at front desk. Generator on east side of building. Ask for Mike in facilities.
CM150-2298
diesel
8/22/2019
11/5/2025
Coolant Hose Assembly (A054K742) x1
All 9 photos required before completing job
Coolant leak detected during last inspection. Unit overheating under load. CRITICAL — medical facility, must be operational.